52 tonne of steel out of 114 tonne that makes up the strength of the building has been completed in a very quick time frame.
The pour is going ahead at this stage on the 17th December 2009.
This is an amazing photo of the bottom layer steel and the electrical conduits that are required to take all the services through the building.